Frequently asked questions about installing a new kitchen

A kitchen project always raises the same questions about the order of the works, the role of each trade and life in the home during the works. Here are our answers. For anything else, tell us about your project.

In what order do the works of a kitchen take place?

We start with the removal of the old kitchen, followed by any demolition, the routing of water and electricity supplies in the walls, the plastering, the floor, a first coat of paint, the assembly of the units, the fitting of the worktop, the splashback, the connections and finally the last coats of paint.

Should the floor be laid before or after the units?

We generally lay the floor before the units, over the whole area. The kitchen can then be altered later without leaving a gap in the flooring. The floor is protected during assembly. When existing units stay in place, the new flooring simply stops against their plinth.

Can the sink or the hob be moved?

The hob can be moved fairly easily, since only a power supply has to be brought to it. The sink depends on the slope of the waste pipe as far as the building’s stack. Our partner plumber checks on site how far it is possible to go.

What happens to the old kitchen and the old appliances?

Our team dismantles them and takes them to sorting and recycling facilities. If you wish to keep an appliance or give units away, tell us before dismantling.

I am a tenant, can I redo my kitchen?

You need the written agreement of the property manager or the owner before any change. We can supply a description and a plan to attach to your request.

What should be planned for in a condominium building?

The inside of your unit belongs to you, but the water stacks, the shared ventilation and the structure are common property. As soon as the project affects them, the administrator must be informed and an agreement may be necessary. We tell you what falls under one or the other.

Extraction hood or recirculating hood?

Extraction sends the air outside and requires a duct designed for it. In many buildings, this duct does not exist or cannot receive a motorised hood. A recirculating hood with a carbon filter is then chosen. We check the situation of your building before the choice is made.

Who designs the kitchen?

The plan is drawn up by our partner kitchen maker, with you. For our part, we point out the constraints of the building, such as a service duct, a wall that is not straight or a socket to be moved, so that the design takes them into account. You approve this plan before any order.

Do the walls have to be redone before fitting?

Flat, square walls make assembly easier and give regular joints against the worktop. After the removal, we therefore redo the skim coats where useful, particularly behind the future splashback.

Can the kitchen be opened onto the living room?

Yes, if the wall is a simple partition, which our team demolishes. If the wall is load-bearing, an appointed engineer must define the reinforcement, and the agreement of the condominium or the owner as well as a permit may be required. We prepare the building permit application file with a qualified agent, and the fees for this application are borne by the client. The works begin once the permit has been obtained.

How does delivery work in town?

During the visit we look at the width of the stairwell, the size of the lift and the parking possibilities in front of the building. A one-piece worktop does not fit everywhere, and it is sometimes planned in two parts with a discreet joint. We also book the lift with the caretaker when the building requires it.

Do you also do the rest of the apartment?

Yes. Many clients take the opportunity of the kitchen to repaint the living room, redo a floor or renovate the bathroom. We then group the works into a single site. The order of the rooms is organised so that you always keep part of the home usable.